{"id":26117,"date":"2025-03-17T13:41:07","date_gmt":"2025-03-17T12:41:07","guid":{"rendered":"https:\/\/baconsulting.ch\/?post_type=project&#038;p=26117"},"modified":"2025-03-17T13:41:07","modified_gmt":"2025-03-17T12:41:07","slug":"ppe-es-brits-etagnieres","status":"publish","type":"project","link":"https:\/\/baconsulting.ch\/?project=ppe-es-brits-etagnieres","title":{"rendered":"PPE Es Brits Etagni\u00e8res"},"content":{"rendered":"<table>\n<tbody>\n<tr>\n<td><strong>Objet<\/strong><\/td>\n<td colspan=\"2\">10 031 &#8211; Construction neuve<\/p>\n<p>Quartier d&rsquo;habitation PPE &#8211; Minergie<\/p>\n<p>Ruelle Es Brits<\/p>\n<p>1037 Etagni\u00e8res<\/td>\n<td><\/td>\n<td>&nbsp;<\/td>\n<\/tr>\n<tr>\n<td><em>Nom du projet<\/em><\/td>\n<td colspan=\"4\"><strong>PPE Es Brits Etagni\u00e8res<\/strong><\/td>\n<\/tr>\n<tr>\n<td><em>Concerne<\/em><\/td>\n<td colspan=\"4\"><strong>CFC 25 &#8211; Installations sanitaires<\/strong><\/td>\n<\/tr>\n<tr>\n<td><em>Construction<\/em><\/td>\n<td colspan=\"2\"><strong>neuve<\/strong><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><em>Travaux<\/em><\/td>\n<td colspan=\"2\"><strong>\u00e0 neuf<\/strong><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><em>Ma\u00eetre de l&rsquo;ouvrage<\/em><\/td>\n<td colspan=\"2\"><strong>Losinger-Marazzi Constructions SA<\/strong><\/p>\n<p><strong>Ch. de Rente 26<\/strong><\/p>\n<p><strong>1030 Bussgny-pr\u00e8s-Lausanne<\/strong><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><em>Ex\u00e9cut\u00e9 pour<\/em><\/td>\n<td colspan=\"2\"><strong>Clien priv\u00e9 &#8211; Entreprise G\u00e9n\u00e9rale<\/strong><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><em>Contact<\/em><\/td>\n<td colspan=\"2\"><strong>M. Zuchuat Pierre<\/strong><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><em>T\u00e9l\u00e9phone<\/em><\/td>\n<td colspan=\"2\"><strong>058 456 72 87<\/strong><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><em>Montant Honoraires<\/em><\/td>\n<td colspan=\"2\"><strong>SFr. 40&rsquo;000 HT<\/strong><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><em>Montant travaux<\/em><\/td>\n<td colspan=\"2\"><strong>SFr. 1&rsquo;050&rsquo;000 HT<\/strong><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><em>P\u00e9riode<\/em><\/td>\n<td><strong>01.03.2010<\/strong><\/td>\n<td><strong>30.10.2012<\/strong><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><em>Mandat en<\/em><\/td>\n<td colspan=\"2\"><strong>Bureau pilote pour pool CVS<\/strong><\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td><em>Prestations<\/em><\/td>\n<td colspan=\"4\"><strong>Prestations selon phase 4.31 \u00e0 4.41 des normes SIA 108.<\/strong><\/td>\n<\/tr>\n<tr>\n<td><em>D\u00e9veloppement de projet<\/em><\/td>\n<td colspan=\"4\"><strong>D\u00e9veloppement d&rsquo;un concept de distribution en ad\u00e9quation avec les normes phoniques actuelles (accrues). Production ECS solaire avec appoint solaires et recirculation interne. <\/strong><\/td>\n<\/tr>\n<tr>\n<td><em>Pr\u00e9ceptes \u00e9conomiques<\/em><\/td>\n<td colspan=\"4\"><strong>Rationalisation des trac\u00e9s d&rsquo;installataion en respect aux normes SIA 385 sur les productions d&rsquo;eau chaude et la distribution d&rsquo;eau chaude (temps de soutirage, etc.).<\/strong><\/td>\n<\/tr>\n<tr>\n<td><em>D\u00e9veloppement durable<\/em><\/td>\n<td colspan=\"4\"><strong>B\u00e2timent Minergie VD-1296<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Objet 10 031 &#8211; Construction neuve Quartier d&rsquo;habitation PPE &#8211; Minergie Ruelle Es Brits 1037 Etagni\u00e8res &nbsp; Nom du projet PPE Es Brits Etagni\u00e8res Concerne CFC 25 &#8211; Installations sanitaires Construction neuve Travaux \u00e0 neuf Ma\u00eetre de l&rsquo;ouvrage Losinger-Marazzi Constructions SA Ch. de Rente 26 1030 Bussgny-pr\u00e8s-Lausanne Ex\u00e9cut\u00e9 pour Clien priv\u00e9 &#8211; Entreprise G\u00e9n\u00e9rale Contact [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":26119,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"project_category":[],"project_tag":[],"class_list":["post-26117","project","type-project","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/baconsulting.ch\/index.php?rest_route=\/wp\/v2\/project\/26117","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/baconsulting.ch\/index.php?rest_route=\/wp\/v2\/project"}],"about":[{"href":"https:\/\/baconsulting.ch\/index.php?rest_route=\/wp\/v2\/types\/project"}],"author":[{"embeddable":true,"href":"https:\/\/baconsulting.ch\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/baconsulting.ch\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=26117"}],"version-history":[{"count":1,"href":"https:\/\/baconsulting.ch\/index.php?rest_route=\/wp\/v2\/project\/26117\/revisions"}],"predecessor-version":[{"id":26122,"href":"https:\/\/baconsulting.ch\/index.php?rest_route=\/wp\/v2\/project\/26117\/revisions\/26122"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/baconsulting.ch\/index.php?rest_route=\/wp\/v2\/media\/26119"}],"wp:attachment":[{"href":"https:\/\/baconsulting.ch\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=26117"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/baconsulting.ch\/index.php?rest_route=%2Fwp%2Fv2%2Fproject_category&post=26117"},{"taxonomy":"project_tag","embeddable":true,"href":"https:\/\/baconsulting.ch\/index.php?rest_route=%2Fwp%2Fv2%2Fproject_tag&post=26117"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}